Technical equipment

Radioactive waste must be supplied to COVRA already separated. The high activity waste is stored in a different facility from the other categories at COVRA. Different requirements are imposed on its storage.

Technical equipment for the characterisation, separation and sorting of waste was unavailable. This was developed by NRG. Equipment including the following is used: